Go to AgTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
Harvest and Processing, corn

Operation and Component Calculation View

Operation Timeliness NPV Calculator

Introduction
This tool calculates net present value totals for operation and component uris. The discounted totals include operating, allocated overhead, capital, and incentive-adjusted totals. Operations or components that have an effective life different than 1 period include annual totals. Resource stock analyzers use the scheduling and timeliness parameters for labor and capital stock planning.

Calculation View Description
These calculations are used in a DevTreks tutorial.V200b

Version: 1.7.0

Feedback About crops/operationgroup/Harvest and Processing, corn/49/operation2

Step 1 of 4. Make Selections


Optional Step 2 of 4. Scheduling and Selection

Step 3 of 4. Calculate

Relations

Use In Childs?
Overwrite Childs?

Step 4 of 4. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions (beta)

Step 1

  • Step 1. Real and Nominal Rates: The nominal rate includes inflation while the real rate does not. In the USA, DevTreks recommends using Office of Management and Budget rates for the same year as the date of the input.

Step 2

  • Step 2. Start Date: Earliest starting date of the operation or component. The date is adjusted in the timeliness calculations to the same date as the children machinery inputs (so be careful with input dates).
  • Step 2. Labor Available (hours per day): The total hours of labor available each day of the operation or component.
  • Step 2. Workday Probability (percent): The percent of days of the operation or component with conditions, such as weather, that allow work to be completed. This number will be divided by 100 in the calculation. (the ASABE reference includes representative workday probabilities)
  • Step 2. Timeliness Penalty (percent output loss per day): The percent of output loss per day if an operation or component is not completed on time. This number will be divided by 100 in the calculation. An additional penalty (plus or minus) can be added when losses change significantly for later operations or components. (the ASABE reference includes representative penalties)
  • Step 2. Timeliness Penalty Days From Start Date (number of days): The number of days (i.e. 35) from the Start Date of an operation or component when the timeliness penalty starts.
  • Step 2. Additional Timeliness Penalty and Additional Days: These two numbers will be added to their respective first penalties to derive an additional penalty.
  • Step 2. Timeliness Penalty Output Name: The name of the output to use for the timeliness penalty. Note that, when this operation/component is added to a budget, the budget's actual outputs will be substituted for these outputs. The substitution will either look for an output with the same name (i.e. corn) or choose the output with the highest revenue. Keep the output naming conventions simple.
  • Step 2. Timeliness Penalty Output Unit: The unit of the output to use for the timeliness penalty. Note that units must be consistent among the inputs, operations and components (i.e. metric, hours per acre).
  • Step 2. Timeliness Penalty Output Price Per Unit: The price per unit of the output to use for the timeliness penalty.
  • Step 2. Timeliness Penalty Output Yield: The yield of the output to use for the timeliness penalty.
  • Step 2. Timeliness Penalty Composition Amount and Unit: Composition of output, generally used for livestock (i.e. 100 head of cattle).
  • Step 2. Timeliness Penalty Output Times: Number of times this yield of output is harvested (can also be used as a general multiplier).

Step 3

  • Step 3. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 3. Overwrite Descendants?: True to insert or update all of the attributes of this same calculator in all children. False only updates children attributes that are controlled by the developer of this calculator (i.e. version, stylehsheet name, relatedcalculatorstype ...)
  • Step 3. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 3. Related Calculators Type: When the Use Same Calculator Pack in Descendant is true, uses this value to determine which descendant calculator to update. Inserts a new descendant when no descendant has this same name. Updates the descendant that has this same name.
  • Step 3. Operation or Component Timeliness Penalty, Operating, and Allocated Overhead Costs: These numbers do not appear when running calculations at the group level. The timeliness penalty is calculated using yield losses alone. The operating and allocated overhead cost calculations do not include the timeliness penalty. Add the two numbers together to get the full operation or component cost. Further explanation of timeliness penalties can be found in the references below.

References

  • American Society of Agricultural and Biological Engineers, ASAE D497.7 MAR2011 Agricultural Machinery Management Data
  • American Society of Agricultural and Biological Engineers, ASAE EP496.3 FEB2006 (R2011) Agricultural Machinery Management
  • John Siemens, University of Illinois User Guide Farm Machinery and Selection Program, Version S10, 1988 ( http://devtreks.cloudapp.net/commontreks/preview/commons/resourcepack/DevTreks%20Machinery%20Costs/437/none ) (last accessed 2012-04-05
  • William Edwards. Iowa State University Farm Machinery Selection, File A3-28, www.extension.iastate.edu/agdm (last accessed February, 2012)
  • Hallam, Eidman, Morehart and Klonsky (editors) Commodity Cost and Returns Estimation Handbook, Staff General Research Papers, Iowa State University, Department of Economics, 1999

Current view of document
Harvest and Processing, corn
Operation Group : Harvest and Processing, corn
Document Status : notreviewed
Description : Examples of crop operations used to explain commodity cost and return estimates.
Label : 8.7.1 Operation Type : 96
Is Price List? : False
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2003 Dry, grain, custom (8/12/2003 12:00:00 AM)
12/31/2003 none no label 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0250  0.0600
Description Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 13.16 13.16 0.16
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 13.16 13.16 0.16
Total Costs - Operation w. Incentives 13.16 13.16
Inputs
Input Name Date Applied Times Incent. Amount Incent. Rate
2003 Dry Grain, Custom
10/16/2003 1 0.0000 0
Total Costs - Input Amount Unit Price Total Interest Total Cost
Total Operating Costs 130 bushel 0.1000 13.00 0.16 13.16
Total Allocated Overhead Costs 0 none 0.0000 0.00 0.00 0.00
Total Capital Costs 0 none 0.0000 0.00 0.00 0.00
Total Costs with Incentives 13.16
Description Custom drying rate for central Iowa.
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Combine, corn grain (8/31/2007 12:00:00 AM)
12/31/2003 A80101 no label 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0600
Description Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 30.26 30.26 0.42
Total Allocated Overhead Costs 44.11 44.11 0.62
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 74.37 74.37 1.04
Total Costs - Operation w. Incentives 74.37 74.37
Inputs
Input Name Date Applied Times Incent. Amount Incent. Rate
Combine, Self Propelled with Grain Head, Large capacity
10/05/2003 1 0.0000 0
Total Costs - Input Amount Unit Price Total Interest Total Cost
Total Operating Costs 0.393 hours/acre 75.9400 29.83 0.42 30.25
Total Allocated Overhead Costs 0.393 hours/acre 110.7100 43.49 0.62 44.11
Total Capital Costs 0 each 159000.0000 0.00 0.00 0.00
Total Costs with Incentives 74.37
Description needs description
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Cut, bale, stack (8/12/1900 12:00:00 AM)
12/31/2003 A80104 n/a 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0600
Description Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 0.00 0.00 0.00
Total Costs - Operation w. Incentives 0.00 0.00
Inputs
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Harvest, almonds (8/12/1900 12:00:00 AM)
12/31/2003 A10 n/a 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0600
Description Sample data sets are used in DevTreks tutorials. This example includes a timeliness penalty calculation.
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 355.19 355.19 5.19
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 355.19 355.19 5.19
Total Costs - Operation w. Incentives 355.19 355.19
Inputs
Input Name Date Applied Times Incent. Amount Incent. Rate
Harvest, almond
10/01/2003 1 0.0000 0
Total Costs - Input Amount Unit Price Total Interest Total Cost
Total Operating Costs 1 acre 350.0000 350.00 5.19 355.19
Total Allocated Overhead Costs 0 acre 350.0000 0.00 0.00 0.00
Total Capital Costs 0 each 0.0000 0.00 0.00 0.00
Total Costs with Incentives 355.19
Description needs description
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Haul, corn grain (8/13/2007 12:00:00 AM)
12/31/2003 A80102 no label 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0600
Description Sample data sets are used in DevTreks tutorials.
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 11.61 11.61 0.16
Total Allocated Overhead Costs 5.07 5.07 0.07
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 16.68 16.68 0.23
Total Costs - Operation w. Incentives 16.68 16.68
Inputs
Input Name Date Applied Times Incent. Amount Incent. Rate
Tractor, 2-Wheel Drive, 110-129 PTO HP
10/06/2003 1 0.0000 0
Total Costs - Input Amount Unit Price Total Interest Total Cost
Total Operating Costs 0.254 hours/acre 40.60 10.31 0.14 10.45
Total Allocated Overhead Costs 0.254 hours/acre 12.6200 3.20 0.04 3.24
Total Capital Costs 0 each 63800.0000 0.00 0.00 0.00
Total Costs with Incentives 13.70
Description needs description
Input Name Date Applied Times Incent. Amount Incent. Rate
Wagon, Gravity Unload, w- Box and Running, Gear, and Tires, 200-400 bu, w-0
10/06/2003 1 0.0000 0
Total Costs - Input Amount Unit Price Total Interest Total Cost
Total Operating Costs 0.254 hours/acre 4.5000 1.14 0.02 1.16
Total Allocated Overhead Costs 0.254 hours/acre 7.0700 1.79 0.03 1.82
Total Capital Costs 0 each 4200.0000 0.00 0.00 0.00
Total Costs with Incentives 2.98
Description needs description
Dataset: Harvest and Processing, corn IRI Examples of crop operations used to explain commodity cost and return estimates.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.